Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/10/2014 |
BUILDING - FINAL |
|
Approved |
|
| 11/06/2014 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection :* |
| 11/06/2014 |
BUILDING - FINAL |
|
Partial Approval |
INSULATE ALL PIPING AS NOTED ON P1.0 PROVIDE VACUUM BREAKER AT WATER HEATER PROVIDE MIXING VALVE AT LAU PROVIDE STERALAZATION REPORT PROVIDE AIR BALANCE REPORT PROVIDE ACCESS TO ROOF CONDENSATE NOT TERMINATED PER PLAN SEE ENGINEER FOR DIRECTION OK FOR CEILING TILES LEAVE OUT PIPE INSULATION |