Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2014 | FIRE SPKLR - FINAL | Approved | ||
| 02/14/2014 | FIRE SPKLR - FINAL | Denied | 1. Need to remove at least 1 sprinkler head. The 3 heads in a triangle formation are located too close together. |