Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 02/03/2014 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection :* |
| 01/29/2014 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
|
| 01/29/2014 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 01/29/2014 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
NO ACCESS |
| 11/21/2013 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. DWV through roof OK. Need to see closet flange. Need to see shower test. |
| 11/18/2013 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
1. Need to see water test on ABS. Need to see shower test. Need to see closet flanges. |
| 11/15/2013 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 11/15/2013 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
OK TO ONE SIDE INTERIOR WALLS |
| 11/13/2013 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
1. A vent must rise vertically a minimum of six inches above the flood rim before offsetting horizontally.. All piping to be tested. Support all water stub outs. Washer p-trap may not be below the floor. Support all vertical pipe. FHA straps, nail guards. |
| 11/08/2013 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection :* |