Permit: T13CM04869

Parcel: 122121420

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
08/21/2013 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
08/19/2013 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/19/2013 PLUMBING - GAS PRESSURE TEST Denied GAS LINE NOT HOLDING PRESSURE. MIN 10LB TEST. INSTALL WATER HEATER ENCLOSURE & CONNECT VENTING. PROVIDE A ROOF JACK WHERE GAS LINE PENETRATES THE ROOF OR SEAL AROUND HOLE. CEMENT THE WOODEN BLOCKS TOGETHER AT PIPING NEAR WATER HEATER.
08/13/2013 PLUMBING - GAS PRESSURE TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/13/2013 PLUMBING - GAS PRESSURE TEST Denied PROVIDE A MIN 10 LB TEST ON ALL GAS PIPING. INSTALL THE PRESSURE GAUGE IN A LOCATION WHERE IT CAN BE EASILY OBSERVED.
GAS PIPE MUST BE MIN 4" ABOVE THE GROUND. EXTEND GAS PIPE INTO THE WATER HEATER ENCLOSURE. REMOVE THE THREADS FROM END OF WATER HEATER T & P DRAIN LINE.
REPLACE NON-WORKING T & P RELIEF VALVE AT FURNACE. PROVIDE A SEDIMENT TRAP AT WATER HEATER. REMOVE THE OLD RISER AT METER & INSTALL ELEC BOND TO NEW GAS LINE.
USE REDWOOD OR PRESSURE TREATED WOOD FOR BLOCKING PIPE ON ROOF.