Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2013 | FIRE SPKLR - FINAL | Approved | ||
| 10/25/2013 | FIRE SPKLR - FINAL | Approved | ||
| 10/17/2013 | FIRE SPKLR - FINAL | Denied | Okay to install ceiling and hard lids Correct blocked sprinkler heads in both bathrooms. |
|
| 10/03/2013 | FIRE SPKLR - FINAL | Denied | Contractor asked if we need to look at upright coverage before he installs all of the ceiling tiles. 1. Middle of building off of the west wall upright coverage missing above duct work 2. Northwest corner of building remove flex duct work off of sprinkler piping and from blocking upright head 3. New wall added for restrooms and office 2x6 metal studs blocking the spray pattern of the uprights NOTE: Please keep ceiling tiles out in areas where corrections are done. |
|
| 09/11/2013 | FIRE SPKLR - FINAL | Denied | 1. Install F.D. key box for the riser room access. 2. Need a 1 inch plane above the upright sprinkler coverage get all insulation 1 inch above the sprinkler coverage. 3. Need an annual sprinkler inspection and 5 year check valve inspection completed. 4. Label riser room door "RISER ROOM" |