Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
1. Before finals I will need: Clarification of panel locations,and number of panels. Install ductwork per plan- or modify plan to match installation. Include the smoke detectors. Provide air balance report. Seal the penetration at the demising wall. Lavatory requires a mixing valve. Method of strilization and clean bacteria report. Replace test plug with countersunk tapped cleanout plug with a machine screw. |