Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T13CM04463
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2013 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
11/15/2013 | BUILDING - FINAL | Partial Approval | ||
09/26/2013 | BUILDING - FINAL | Not ready for Inspection | 1. Please note: During a scheduled inspection on the discharge side of the new grease interceptor, the inspector observed the existing sanitary sewer connection between the building sewer and the 8" sewer main. First, the 8" SDR-35 private sewer was saddle tapped with a 4" tap. The 4" pipe was extended approx. ten feet where it was enlarged to the 6" bldg. sewer. The contractor took pictures. The reduction of the bldg. sewer from 6" to 4" is a violation of code. See section 706.2 2012 IPC. The four inch saddle tap is a violation of code. See section 707.1 2012 IPC. Saddle tapping is only permitted on public sewers with flow. This situation needs to be remedied immediately. |