Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2013 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/24/2013 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 09/24/2013 | PLUMBING - ROUGH, SOIL | Denied | EACH DRY VENT SHALL RISE VERTICALLY TO A POINT 6" ABOVE FLOOD LEVEL OF FIXTURE. 3" CO SHOWN AT UPPER END. | |
| 08/29/2013 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 08/28/2013 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* | |
| 08/28/2013 | PLUMBING - ROUGH, SOIL | Partial Approval | CORRECT VENTS OUT, INSTALL WRAPS @ FCO |