Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T13CM04016
Inspection Description - FRAMING
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/22/2013 | FRAMING | Approved | IVRS - Inspection :* | |
| 07/19/2013 | FRAMING | Not ready for Inspection | 1. 1/2" lag bolts required for 2"X2" stl. post. | |
| 07/17/2013 | FRAMING | Not ready for Inspection | 1. A-1 detail one. Bottom track anchor metal studs to floor at 34" on center with one and a half inch power driven fasteners. Show that the correct fastener was used. A-1 detail two. 2"X2" steel post at 48" on center. half inch lag bolts required. Bolts installed are not tight. A-1 A shows partition extending one inch past the existing floor sink. Plumbers tape is not an approved strap. Support copper stub outs. | |
| 07/12/2013 | FRAMING | Not ready for Inspection | 1. Partition not constructed per plan. See sheet A-1 Details #01 and #02. Isolate copper from the metal studs. Support copper in the walls. Support copper stub outs. |