Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2013 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 11/14/2013 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 11/14/2013 | PLUMBING - INTERMEDIATE | Partial Approval | PROVIDE PLENUM RATED WIRE INSIDE RETURN AIR PLENUM. PROVIDE A TRAP ON CONDENSATE DRAIN & A SECONDARY OVERFLOW SENSOR. OK TO INSULATE HOT WATER PIPING PER PLAN. PROVIDE MAIL PLATES AT WATER LINES FOR HVAC. PROVIDE BACKING AT SIDEWALK REGISTER BOXES. ISOLATE COPPER CONDENSATE DRAIN FROM KNOCKOUT IN PLENUM & RESTING ON METAL FRAMING. | |
| 09/12/2013 | PLUMBING - INTERMEDIATE | Partial Approval | drain abs ok need water supply |