Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T13CM03657
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2014 | FIRE - FINAL | Approved | All reports are in | |
05/19/2014 | FIRE - FINAL | Partial Approval | Need annual fire sprinkler, fire alarm and 5 year check valve inspections done. After reports are in this permit will be closed out. | |
12/18/2013 | FIRE - FINAL | Denied | Phase 2 of 3 approved According to spec sheet for the sprinkler heads need to extend through ceiling tiles by max of 7/8 of an inch to min of 5/8 of an inch |
|
09/07/2013 | FIRE - FINAL | Partial Approval | 1. ok to occupy bldg 940 phase g. | |
08/26/2013 | FIRE - FINAL | Denied | 1. Under permit number T12CM06369 the following was stated: "IFC 907.2.2 combined Group B load for all floors is 500 or more or occupant load is more than 100 persons above or below the lowest level of exit discharge. You can use the first floor only at this time, but when going for the C of O final for the 2nd floor a completely fully operational fire alarm system that meets the IFC 907 and the NFPA 72 standards will be needed. " 2. Need to have sprinkler contractor to call in all of there permits before your final will be approved. |