Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2013 | FIRE SPKLR - FINAL | Approved | Phase 2 of 3 approved According to spec sheet for the sprinkler heads need to extend through ceiling tiles by max of 7/8 of an inch to min of 5/8 of an inch |
|
| 08/26/2013 | FIRE SPKLR - FINAL | Denied | 1. There are some sprinkler heads even with the drop ceiling tiles sprinkler heads need to a min of 1 inch below drop ceiling at all times. Need to walk floor and lower all heads that are not 1 inch below. |