Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/11/2013 | FIRE - ALARM FINAL | Approved | ||
| 09/09/2013 | FIRE - ALARM FINAL | Denied | Need to have water flow signal go to monitoring company as a water flow and no as zone number. | |
| 09/05/2013 | FIRE - ALARM FINAL | Partial Approval | 1. Need to separate water flow signal out to report to monitoring company as a water flow. 2. Install lock outs on breakers to the FACP - Sprinkler bell - Monitoring system. I tested all duct detectors to the A/C units, all units shut completely down and reported to the FACP system. |
|
| 09/04/2013 | FIRE - ALARM FINAL | Denied | NO PHONE LINES 1. Testing was completed on fire alarm system all passed but will need to do a test on water flow and tamper for the phone lines. 2. Need lock out on breaker |