Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T13CM03102
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/12/2013 | FIRE - FINAL | Approved | ||
11/06/2013 | FIRE - FINAL | Partial Approval | 1. In the mechine shop hallway install EM lighting per approved plans. 2. EM lighting needed above exit door in mechine shop. |
|
10/31/2013 | FIRE - FINAL | Partial Approval | Partial approval - OKAY to ust building to get final the following will need to be done: 1. Need to test battery back up lighting for 20 mins run time 2. Remove rear exit door as per approved plans 3. IFC 1008.1.10.1 On the south exit door - "The actuating portion of the releasing device shall extend at least one-half of the door leaf width..." |
|
10/23/2013 | FIRE - FINAL | Denied | 1. Need to test battery back up lighting for 20 mins run time 2. Remove rear exit door as per approved plans 3. IFC 1008.1.10.1 On the south exit door - "The actuating portion of the releasing device shall extend at least one-half of the door leaf width..." |