Permit: T13CM03089

Parcel: 13323190A


Addresses:

7812 E SPEEDWAY BL

Inspection Status: Partial Approval

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
08/23/2013 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
08/22/2013 PLUMBING - ROUGH, SOIL Partial Approval FLORAL SOIL PIPING OK
08/21/2013 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*
08/20/2013 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/20/2013 PLUMBING - ROUGH, SOIL Denied DRY VENT SHALL RISE VERTICALLY TO 6" ABOVE FLOOD LEVEL. INSTALL VACUUM BREAKER ON HOSE CONNECTION. INSTALL WRAPS AT FLOOR PENETRATION.
08/19/2013 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection :
See detailed listing on site.| 999*
08/19/2013 PLUMBING - ROUGH, SOIL Denied P1.1 INSTALL W/ VERTICAL VENTS AS SHOWN