Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T13CM02919

Parcel: 134140170

Inspection Status: Approved

Inspection History: PLUMBING - PROGRESS

Date Description Inspector Results Comments
09/13/2013 PLUMBING - PROGRESS Approved IVRS - Inspection :*
07/25/2013 PLUMBING - PROGRESS Denied WALLS OK TO COVER. MAKE ALL CLEANOUT FITTINGS ACCESSABLE
07/15/2013 PLUMBING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
07/15/2013 PLUMBING - PROGRESS Denied ***PROVIDE A TEST AS PREVIOUSLY NOTED***
1. EACH VENT SHALL BE CRADLED TO DRAIN
2. EACH DRY VENT SHALL RISE VERTICALLY TO A POINT 6" ABOVE FLOOD LEVEL OF UPPER FIXTURE
3. ALSO PROVIDE PROPER USE OF FITTINGS
07/10/2013 PLUMBING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
07/10/2013 PLUMBING - PROGRESS Denied TEMP CAPS NOT APPROVED FOR DEMO. PROVIDE PERM CAPS TO BE CONCEALED. SINK REVENT OFFSET SHALL BE MIN 6" ABOVE FLOOD LEVEL. NEW WORK REQUIRES A TEST. SECURE ALL PIPING. AT EXTERIOR - WOOD MAY NOT TOUCH DIRT. GROUND METAL BOXES
06/10/2013 PLUMBING - PROGRESS Partial Approval IVRS - Inspection :*
06/06/2013 PLUMBING - PROGRESS Denied IVRS - Inspection :
See detailed listing on site.| 999*
06/06/2013 PLUMBING - PROGRESS Denied CORRECT LEAK - SE CORNER
CORRECT SLOPE. COMPLETE NOTED CORRECTIONS.
CAP OPEN DRAIN PIPES FOR SAFETY
FINAL WARNING
INSPECTION STOPPED