Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PROGRESS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2013 | PLUMBING - PROGRESS | Approved | IVRS - Inspection :* | |
| 07/25/2013 | PLUMBING - PROGRESS | Denied | WALLS OK TO COVER. MAKE ALL CLEANOUT FITTINGS ACCESSABLE | |
| 07/15/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/15/2013 | PLUMBING - PROGRESS | Denied | ***PROVIDE A TEST AS PREVIOUSLY NOTED*** 1. EACH VENT SHALL BE CRADLED TO DRAIN 2. EACH DRY VENT SHALL RISE VERTICALLY TO A POINT 6" ABOVE FLOOD LEVEL OF UPPER FIXTURE 3. ALSO PROVIDE PROPER USE OF FITTINGS |
|
| 07/10/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 07/10/2013 | PLUMBING - PROGRESS | Denied | TEMP CAPS NOT APPROVED FOR DEMO. PROVIDE PERM CAPS TO BE CONCEALED. SINK REVENT OFFSET SHALL BE MIN 6" ABOVE FLOOD LEVEL. NEW WORK REQUIRES A TEST. SECURE ALL PIPING. AT EXTERIOR - WOOD MAY NOT TOUCH DIRT. GROUND METAL BOXES | |
| 06/10/2013 | PLUMBING - PROGRESS | Partial Approval | IVRS - Inspection :* | |
| 06/06/2013 | PLUMBING - PROGRESS | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 06/06/2013 | PLUMBING - PROGRESS | Denied | CORRECT LEAK - SE CORNER CORRECT SLOPE. COMPLETE NOTED CORRECTIONS. CAP OPEN DRAIN PIPES FOR SAFETY FINAL WARNING INSPECTION STOPPED |