Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/22/2017 | PLUMBING - FINAL | Approved | ||
| 08/21/2017 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE AN EXPANSION TANK FOR THE WATER HEATER. 2- SHALL PROVIDE A VACUUM RELIEF VALVE ON THE COLD WATER SUPPLY TO THE WATER HEATER. 3- SHALL PROVIDE A DRAIN FOR THE WATER HEATER DRAIN PAN. 4- SHALL PROVIDE AN OPEN FRONT SEAT AT WATER CLOSET. 5- SHALL PROVIDE A MIRROR FOR THE LAVATORY LOCATED 40 INCHES TO THE REFLECTION FROM FINISH FLOOR. 6- SHALL PROVIDE FRESH BACKUP BATTERIES FOR THE EMERGENCY LIGHTING. 7- SHALL PROVIDE A LOCK OUT TAG OUT CLIP ON THE WATER HEATER DEDICATED CIRCUIT BREAKER. 8- SHALL PROVIDE A CIRCUIT BREAKER SCHEDULE AT SERVICE PANEL. 9- SHALL PROVIDE TEST AND CERTIFICATION FOR THE BACKFLOW PREVENTER. |