Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2013 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 12/06/2013 | PLUMBING - INTERMEDIATE | Approved | OK FOR INSULATION & SHEETROCK | |
| 11/27/2013 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/25/2013 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 11/22/2013 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 11/22/2013 | PLUMBING - INTERMEDIATE | Denied | 1 1/4 WATER SUPPLY SHOWN W/ 1" SPLIT TO EACH END OF HOSE. SOFTENER IS NOT SHOWN. ADD DEVELOPED LENGTH. PROVIDE FULL SIZED PIPING THROUGH SOFTENER & SLIT. PROTECT PEX @ STUCCO. REMOVE METAL CLAMPS. SUPPORT AS REQUIRED. PROVIDE 18" AT COPPER SWEAT CONNECTIONS. INSULATION REQUIRED ON HW TO KITCHEN. WH REQ A DRAIN PAN. CPVC REQ PRIMER OR APPROVED CEMENT. PROVIDE CODE APPROVED PIPING SUPPORTS ON PEX, BLK STEEL, HOUSE VAC, & MECH OVERHEAD. VENT 90 AND HORIZONTAL OFFSET OF KIT VENT BELOW FLOOD LEVEL NOT ALLOWED. PIPE GAS INTO FACE PLATE & TEST. TEST DWV. INSP OF CLOSET FLANGE & SHOWER PAN LINER REQ WHEN READY. |