Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/20/2014 |
BUILDING - FINAL |
|
Approved |
|
| 06/19/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
|
| 06/19/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
MAKE CORRECTIONS FROM PREVIOUS INSPECTIONS. FUTURE INSPECTIONS MAY BE CHARGED A RE-INSPECTION FEE |
| 06/17/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 06/17/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
PROVIDE NON ADJUSTABLE COMBUSTON AIR VENT EQUAL TO THE REQUIRED AREA SECURE HOSE THREAD VACUUMM BREAKERSAS REQUIRED BY 2012IRC 2902.4.3 WATER HEATER IS NOT WORKING, CURRENT AND TURN ON. BRANCH CONECTION ON WATER SUPPLY TO IRIGATION OR POND REQUIRED BACKFLOW PROTECTION OR REMOVE CONNECTION. COMPLETE NOTE CORECTION 15AMP RECEPTICAL AT JACCUSSI MOTOR IS NOT RATED FOR CONT USE 14AMP MOTOR. 20AMP RECEPTICALS REQUIRED. FOLLOW YOUR PLAN (SEE PG 9). PROVIDE COMPLAINCE WITH CITY LEG ORDINANCE. OUT DOOR FIXTURES (FLOOD LIGHT) NOT POR PLAN. INDIRUCT (RECEPTOR SEC P2706.1) |
| 06/12/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 06/12/2014 |
BUILDING - FINAL |
|
Not ready for Inspection |
INSTALL HOSE BIB VACUUM BREAKERS! SEAL ALL THREADED OPENINGS IN DWV SYSTEM. UV PROTECTION FOR ALL EXPOSED PLASTIC & INSULATION. LOCKING CAPS ON A/C COMPRESSOR. DISCON COVER. ACCESS REQUIRED FOR JACCUZZI PUMP & OUTLET. SEAL ALL FLOOR PENETRATIONS. PROVIDE COMBUSTION AIR OPENINGS. LINESET PROTECTION. PROVIDE 20 AMP RECEPTICLES WHERE REQUIRED OR SHOWN. PROVIDE IRRIGATION BACKFLOW PROTECTION. FLOOR SINK REQUIRES "READY ACCESS" IPC 802.3. TEMPERING VALVES REQUIRED FOR TUB & BIDET. 2713.3, 2721.2 IRC. ANTI-TIP BRACKET FOR STOVE. CARBON MONOXIDE DETECTORS REQUIRED PER 2012 IRC. PROVIDE ROOF ACCESS. EXP TANK SHOWN ON PLAN. HAMMER ARRESTORS. VACUUM BREAKER REQUIRED AT HAMMER ARRESTORS. VACUUM BREAKER REQUIRED AT HAND HELD SHOWER. RO DRAIN REQ AIR GAP. ALSO ICE(?) INSP STOPPED. COMPLETE ALL WORK & NOTED CORRECTIONS. |
| 12/20/2013 |
BUILDING - FINAL |
|
Partial Approval |
OK TO TAPE WHOLE HOUSE |
| 12/19/2013 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection :* |
| 12/19/2013 |
BUILDING - FINAL |
|
Partial Approval |
OK TO TAPE WHOLE HOUSE |
| 12/18/2013 |
BUILDING - FINAL |
|
Partial Approval |
WEST 1/2 OF DWELLING DRYWALL |
| 12/17/2013 |
BUILDING - FINAL |
|
Partial Approval |
IVRS - Inspection :* |
| 11/22/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
TEMP HB REQ A VACUUM BREAKER. BIDET & TUB WILL REQ ANTI-SCALD PROTECTION |
| 11/22/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* MAKE CORRECTIONS FROM PREVIOUS INSPECTIONS. FUTURE INSPECTIONS MAY BE CHARGED RE-INSPECTION FEE. |