Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 09/30/2013 |
BUILDING PRE-SLAB |
|
Approved |
IVRS - Inspection :* |
| 09/27/2013 |
BUILDING PRE-SLAB |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 08/29/2013 |
BUILDING PRE-SLAB |
|
Partial Approval |
1. This inspection is for 01005- excavation, layout, and rebar. Reopen this activity as there are still more inspections. Reopen 01015 as there are at least two more concrete pours. At Washbay #02, and #03 OK for concrete. |
| 08/27/2013 |
BUILDING PRE-SLAB |
|
Partial Approval |
IVRS - Inspection :* |
| 08/27/2013 |
BUILDING PRE-SLAB |
|
Partial Approval |
OK TO POUR WASH BAY BUILDING 1 |
| 08/21/2013 |
BUILDING PRE-SLAB |
|
Partial Approval |
APPROVED FFE, CHANGED TO PA FOR INSPECTION |
| 04/12/2013 |
BUILDING PRE-SLAB |
|
Continued |
Elevation Certificate for form boards are required to be approved by the ENGINEERING Section only prior to pouring of the concrete. Contact Jason Green at 837-4929 or Loren Makus at 837-4927 for ELCERT review. JG |