Permit: T13CM01823

Parcel: 130021250


Addresses:

2911 E 27TH ST

Inspection Status: Not ready for Inspection

Inspection History: BUILDING - FINAL

Date Description Inspector Results Comments
04/04/2013 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) RECEIVED LETTER FROM ELEC. CONTRACTOR, INSPECTION DOCUMENT FORM E.L. SHOWS ELECTRICAL IN GOOD ORDER AND UP TO CODE
2) JOIST TO EXTERIOR WALLS TIED IN WITH H2.5 OK
3) JOISTS TO STRUCTURE TIED IN WITH SIMPSON HANGERS OK
4) PLUMBING IS EXISTING.
5) FOOTER WAS DUG UP AND APPROVE TO BE CODE COMPLIANT.
6) ALL APPEARS TO BE IN GOOD ORDER AND WORKMANSHIP WITH THE EXCEPTION FOLLOWING. BOTTOM PLATE OF INTERIOR AND EXTERIOR WALLS ARE NOT PRESSURE TREATED OR REDWOOD.
04/02/2013 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) ALL WORK IS ALREADY COMPLETE. UNABLE TO DO INSPECTION.