Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/16/2013 |
PLUMBING - ROUGH, SOIL |
|
Approved |
|
| 09/12/2013 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
1. No test on systems. Where a vent connects to a drain, it shall connect above the drainage centerline. It shall rise vertically to a point not less than 6" above the overflow before offsetting horizontally. (No horizontal dry vent allowed in the IRC.) Piping to be laid on a firm bed with fittings belled. |