Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/03/2013 | FIRE SPKLR - FINAL | Approved | ||
| 06/05/2013 | FIRE SPKLR - FINAL | Denied | IFC 901.6 Sprinkler testing 1. Need annual sprinkler inspection due IFC 903.4.1 Monitoring 1.Need approved UL/FM approve fire alarm system installed to monitor the sprinkler system. 2. Need lock out on the breaker for the fire alarm bell IFC 901.5 Equipment 1.Need waxed coated sprinkler heads in spare head box by riser. Need this done before C of O will be approved |