Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2013 | FIRE - FINAL | Approved | ||
| 08/28/2013 | FIRE - FINAL | Partial Approval | Temp C of O approved to get final C of O the following will need to be completed: 1. Correct upright sprinkler coverage above hood system one head is blocked by silver flex duct work. 2. Replace all missing insulation in the trusses upright sprinkler heads cannot be more than 22 inches from the roof deck, you can use the insulation as the deck for measurement. |