Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T13CM01472
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2013 | FIRE SPKLR - FINAL | Approved | ||
| 08/28/2013 | FIRE SPKLR - FINAL | Partial Approval | Temp C of O approved to get final C of O the following will need to be completed: 1. Correct upright sprinkler coverage above hood system one head is blocked by silver flex duct work. 2. Replace all missing insulation in the trusses upright sprinkler heads cannot be more than 22 inches from the roof deck, you can use the insulation as the deck for measurement. |
|
| 08/26/2013 | FIRE SPKLR - FINAL | Denied | 1. Remove orange package protection cover on sprinkler head in cooler. 2. Re-install insulation on deck uprights cannot be more than 22 inches from the deck. 3. Need escutcheon around sprinkler head in the bathroom. 4. Correct upright coverage above hood system upright head block by flex duct. |
|
| 07/31/2013 | FIRE SPKLR - FINAL | Not ready for Inspection |