Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 04/26/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
|
| 04/26/2013 |
BUILDING - FINAL |
|
Approved |
|
| 04/23/2013 |
BUILDING - FINAL |
|
Not ready for Inspection |
1. Label electric panels- provide schedule both panels. Indirect wate piping to be approved material type. No back pitch, traps,m etc. Floor sink requires a strainer. 1" air gap will be strictly enforced. All water supplied fixtures to have an air gap or other approved method. All backflow devices to be secured, connected, and labeled. Support mixing valves. THoroughly flush water system. |