Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T13CM01057
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/01/2013 | BUILDING - FINAL | Approved | ||
| 04/26/2013 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 04/23/2013 | BUILDING - FINAL | Not ready for Inspection | 1. Will require an approved plan showing and detailing all work. Found the plan. Expose the footing at 12x12 slab for footing verification. Provide a ladder for roof access. Hammer arrestors at washer box. AVBs on all hose bibbs. Verify depth and tie-in location for the sewer connection. Verify depth and material type for yardwater piping. Verify material type for water piping in the walls. |