Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2013 | ENGINEERING - FINAL | Approved | PER SIGNED JOB CARD | |
| 10/31/2013 | ENGINEERING - FINAL | Not ready for Inspection | ||
| 09/27/2013 | ENGINEERING - FINAL | Continued | 1) DISCUSSED OPTIONS TO ENSURE COMPLIANCE WITH ADA FOR PARKING AND ACCESS FROM PARKING LOT. 2) ENSURE ROOF DRAINS ARE ROUTED UNDER THE SIDE WALK. 3) PAAL 'S MUST BE 24' FOR TWO WAY TRAVEL 4) INSTALL TRUNCATED DOMES PER APPROVED SITE PLAN |
|
| 09/25/2013 | ENGINEERING - FINAL | Continued | 1) THE SITE PLAN CALLS OUT EXISTING ADA PARKING AND ACCESS, BUT THERE IS NONE ON SITE. 2) ADA PARKING/LOADING SLOPES MUST BE NO GREATER THAN 2% IN ANY DIRECTION. ADA PEDESTRIAN ACCESS RUN SLOPES MUST BE NO GREATER THAN 5% AND CROSS SLOPE NO GREATER THAN 2% . 3) MAIN ROOF DRAIN MUST NOT DROP ONTO SIDEWALKS PER COT DEV STD |