Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2013 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 05/22/2013 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/22/2013 | BUILDING - FINAL | Denied | 1. GROUNDS & NEUTRALS TO BE SEPARATED IN COMBINER 2. PRINT DOESN'T SHOW BREAKERS OR COMBINER 3. DISCONNECT GROUNDWIRE TO BE PHASED & METER BASE 4. CHASE NIPPLE NOT INSTALLED TO CODE 245 5. GROUNDS & NEUTRALS TO BE SEPARATED ON ROOF LOAD CENTER 6. GROUNDING ELECTRODE TO BE BONDED ON BOTH ENDS CODE 250.64 FROM INVERTER TO SERVICE PANEL 7. LABELS MISSING AT SERVICE WHERE IS INVERTER 8. LB ON ROOF TO BE STRAPED WITHIN 3' 9. SOLAR RAILS ON ROOF TO BE BONDED, J. BOXES TO BE BONDED 10. LBS FROM 1 ROOF TO ANOTHER CONNECTORS LOOSE 11. SEAL OPENINGS ON BACK OF INVERTER DISCONNECT & ON J. BOXES |