Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T13CM00604

Parcel: 130152200


Addresses:

4626 E 25TH ST

Inspection Status: Approved

Inspection History: PLUMBING - GAS PRESSURE TEST

Date Description Inspector Results Comments
02/07/2013 PLUMBING - GAS PRESSURE TEST Approved IVRS - Inspection :*
02/04/2013 PLUMBING - GAS PRESSURE TEST Partial Approval IVRS - Inspection :*USE PROPERLY SIZED CLAMPS TO SECURE PIPE. WH RELIEF VALVE MAY NOT BE TRAPPED. REMOVE TAPE FROM VENT CONNECTIONS. AND SECURE EACH JOINT W/ #SCREWS. EXTEND B VENTS TO TERMINATIONS ABOVE COOLER. PROVIDE ELECTRICAL BONDING. INSTALL TOO AND SHUT OFF VALVES AT APPLIANCES. SEDIMENT TRAPS REQUIRED AT APPLIANCE CONNECTIONS.