Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/31/2013 |
PLUMBING - FINAL |
|
Approved |
|
| 01/30/2013 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1. Copper mounted on the wall above grade to be insulated. How does sleeving the pipe above grade offer insulative properties to keep the pipe from freezing? OK to shade the exposed PEX below grade withclean fill. OK to cover sleeved pipe. At outside water heater: Piping mounted on the wall to be insulated. |
| 01/29/2013 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 01/28/2013 |
PLUMBING - FINAL |
|
Not ready for Inspection |
|
| 01/25/2013 |
PLUMBING - FINAL |
|
Not ready for Inspection |
1. PEX yardwater installed at minimum burial depth. Will require 6" of clean fill to shade the pipe. Native soils too rocky. Copper pipe mounted on wall above grade to be insulated. |