Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2014 | FIRE SPKLR - FINAL | Approved | ||
| 12/17/2013 | FIRE SPKLR - FINAL | Not ready for Inspection | 1. need to reconfigure heads in records room upstairs. 2. need to lower head in lower level by stairs in north west portion of the building to close to beam. |
|
| 12/13/2013 | FIRE SPKLR - FINAL | Denied | 1. need all ceiling tiles to be in place 2. all tape must be removed from heads 3. all heads on outside canopy needs to be trimmed with excussion. |