Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T13BU01009
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/20/2014 | FIRE SPKLR - FINAL | Approved | ||
01/16/2014 | FIRE SPKLR - FINAL | Partial Approval | Water flow - Passed Sprinkler bell - Passed 1. Need fire final test results & factory pump test results 2. Label fire riser door "FIRE RISER ROOM" 3. Correct sprinkler coverage in the freezer room west side 4th one, blocked by lights 4. Sign pump test header 5. Sign all valves in fire pump room and all auxiliary drain valves on sprinkler system |
|
01/15/2014 | FIRE SPKLR - FINAL | Partial Approval | 1. Fire Pump test completed. 2. All tampers tested okay. 3. Need to test Water Flow and bell. |