Inspection Status: Closed
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2022 | FIRE SPKLR - FINAL | Closed | CONTRACTOR DID NOT CALL IN PERMIT TO COMPLETE FINAL INSPECTION. PERMIT CLOSED WITHOUT FINAL INSPECTION. | |
| 08/26/2013 | FIRE SPKLR - FINAL | Denied | 1. Remove orange package protection cover on sprinkler head in cooler. 2. Re-install insulation on deck uprights cannot be more than 22 inches from the deck. 3. Need escutcheon around sprinkler head in the bathroom. 4. Correct upright coverage above hood system upright head block by flex duct. |