Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA PRE-GUNITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2013 | POOL/SPA PRE-GUNITE | Approved | IVRS - Inspection :* | |
| 07/10/2013 | POOL/SPA PRE-GUNITE | Not ready for Inspection | IVRS - Inspection :* | |
| 07/10/2013 | POOL/SPA PRE-GUNITE | Not ready for Inspection | ALL SOLVENT CEMENTED JOINTS REQUIRE THE USE OF PVC PRIMER. REMOVE ALL SHARP ROCKS TOUCHING PIPE. WATER SUPPLY REQUIRES HIGH HAZARD BACKFLOW PROTECTION W/ TEST. 4' SHOWN ON PLAN TO EDGE OF POOL. **NOTE: NO PIPING DIAGRAM HAS BEEN PROVIDED** |