Inspection History Details
Inspection Status: Approved
Inspection History: POOL/SPA PRE-GUNITE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2013 | POOL/SPA PRE-GUNITE | Approved | IVRS - Inspection :* | |
| 04/24/2013 | POOL/SPA PRE-GUNITE | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 04/24/2013 | POOL/SPA PRE-GUNITE | Denied | -HIGH HAZARD BACKFLOW ASSEMBLY NEEDED FOR AUTO POOL FILL -HORIZONTAL REBAR EXCEEDS SPACING AT BACK WALL OF SPA -BONDING GRID NEEDED TO ENCIRCLE POOL W/ 4 PIGTAILS ATTACHED TO REBAR -HEATER BOND? -PROVIDE LITERATURE FOR APPROVAL OF 2 BOND WIRES INTO SINGLE REBAR CLAMP FROM MANUFACTURE -RECONNECT GROUNDING CONDUCTOR TO 2ND GROUND ROD FOR MAIN PANEL -18" MINIMUM BURIAL NEEDED ON TOP OF PLASTIC GAS LINE -REBAR REINFORCEMENT AROUND SPA LIGHT PER ENGINEERING SPECS |