Inspection History Details
Inspection Status: Partial Approval
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/24/2012 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* 1) PROVIDE FULL SIZE VENT ? 2) PROVIDE CORRECT 3 X 4 INREASTER-INSTALLED IN THE PROPER DIRECTION OF FLOW |
|
| 01/23/2012 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) LARGER BTU FURNACE IS REQUIRED TO BE THE LOWER CONNECTION WITH WATER HEATER CONNECTING TO THE SIDE 2) PROVIDE LISTED VENT TOE AND TYPE B VENT THRU ROOF 3) RELIEF VALVE DRIPPING |