Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2012 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* 1) FURNACE HAS BEEN REPLACED PREVIOUSLY AND REQUIRES PROPERLY SIZED VENTING OF WATER HEATER APPROVED MATERIALS 2) INSTALL FULL SIZED TEE AT GAS SUPPLY 3) PROVIDE A MINIMUM 10 PSI TEST WITH A 15 POUND GAUGE |