Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit has been finaled today. At this time the case will be closed. Violation Abated, Close Case. RV. | |
| 05/20/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit is still current and the last inspection was on 2-24-14 and needing correction. The permit expires on 8-23-14 and all the areas have been inspected. Will check in 90 days. RV. | |
| 04/21/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit is still current and expires on 8-23-14. The last inspection was on 2-24-14 and needs corrections. Will check in 90 days. RV. | |
| 01/14/2014 | INSP - FOLLOW UP CODE ENFORCE | Approved | The permit is still current and expires on 3-17-14 and no inspection has been done. Will check in 90 days. RV. | |
| 10/09/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: The permit has been issued on 9-18-13 with no inpsection. Will check in 90 days. |
|
| 09/05/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Office Follow Up: The permit has been approved on 9-3-13 and is only lacking the payment. Did talk to the owner and will be getting the permit next week when he gets the money. Once the permit is issued and will call for the inspection. Will check in 30 days. |
|
| 07/18/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | The owner has been in contact and has some one doing the drawings. They have submitted the plans for plan check and need some correction on the plans. Other items have been included on the plans for approval. Will check in 45 days. RV. | |
| 05/29/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | Talk to the owner and the draftsman is still working on the drawings and hopes to be completed in a couple weeks. When the drawings are done will be submitting for approval. A D.D.O. may be required for the setbacks in the front. Will check in 45 days. RV. | |
| 04/15/2013 | INSP - FOLLOW UP CODE ENFORCE | Approved | The porches are still up and the owner is having trouble getting the plans done due to lacking the money to pay for the plans to be done. Did review that the fines will start being accessed if nothing is being done to get the plans approve or started. Will check in 45 days to check the status of the plans. RV. |