Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T12DV10818
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2012 | INSP - INITIAL CODE ENFORCMENT | Approved | WENT TO SITE, MET W/APT MGR. SEWER PIPE IN BLDG 1 PARTIALLY COLLAPSED CAUSING SEWAGE TO BACKUP INTO THE TOILETS AND BATHTUBS ONTO THE FLOORS IN SEVERAL APARTMENT UNITS. KNOCKED ON ALL DOORS AND CHECK ALL BATHROOMS FOR BACK UP TO SEE WHO WAS AFFECTED BY THE BROKEN PIPE. UNIT #109 THE TOILET AND TUBS DRAIN OK BUT STILL SEWAGE ON THE FLOOR. #110 BATHTUB AND TOILETS BACKED UP, OCCUPANTS CLEANED UP SEWAGE WITH THEIR BATH TOWELS. #103 SEWAGE ON FLOOR IN TUB AND IN TOILET IN MASTER BATHROOM (UNIT IS VERY DIRTY INSIDE). #101 BACKED UP IN TUB AND TOILET. SCUTTER MISSING OFF THE WALL ON BLDG #1. APT MANAGER CONTACTED ROOTER 2000 THE SEWER PIPE IS SCHEDULED TO BE FULLY REPAIRED ON 12/03/2012 . CLEANING COMPANY ON CALL TO CLEAN AND SANITIZE ANY UNIT THAT HAS SEWAGE BACKUP. THEY WERE DUE ON TODAY AND WILL CONTINUE TO COME OUT AND CLEAN UP AS THE TUBS BACK UP. ISSUED NOV ON SITE HAND DELIVERED TO APT MGR. |