Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit has been finaled 5-9-14. At this time the case will be closed. Violation Abated, Close Case. RV. |
| 03/10/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The permit is still current and the last inspection was on 3-6-14 needing correction. The owner has been in contact with the inspector and kept updated on the inspection. Will check in 90 days. RV. |
| 01/08/2014 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Talk to the draftsman and the work is being done. The permit was issued on 11-13-13 and the last inspection was done on 12-10-13, T13CM02690. Will check in 60 days. RV. |
| 09/30/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The D.D.O. process has been completed and approved. The plans are being submitted for approval on the other trades and should be done in 30 days. Will check in 60 days. RV. |
| 08/28/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The D.D.O. has been approved on 8-21-13 and still waiting for the grace period to pass which is 9-4-13. Have been in contact with the draftsman and he was going to check if the permit could be issued today or do we still have to wait till the 9-4-13 date passes. Will check in 30 days. RV. |
| 07/16/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Have been in contact with the draftsman and they are getting the D.D.O. process started. They have agreed to stay with the L.U.C. for approval due to the area being questioned on the rear of the property. Will check in 45 days. RV. |
| 05/24/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The draftsman is still working on the with P.D.S.D. on the garage in the rear yard. The plans are completed but are going over the other work added to the property. Will check in 45 days. RV. |
| 04/08/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Extension granted to 3-D Architect. Hired to do the drawings. Follow-up within 45 days. |
| 03/29/2013 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The work is still up and the owner is having trouble with the person hired to make the drawings. He will be calling another person to have the drawings done due to running out of time before the fines start. Will check in 30 days. RV. |
| 11/13/2012 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Met with the son and they are still working on the plans for approval and making all the changes to re-submit. The father has been doing the plans and he has been to the office for more time. Have next follow up date on 11-23-12 and will check the status of the permit. RV. |