Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T12DV08606
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2012 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET MANAGER, DISCUSED THE ELECTRICAL ISSUES AND THE SAFETY HAZARDS IN THE KITCHEN AREA, ALSO EXPLAINED THE NOTICE OF VIOLATION, AND THE PROCESS, TIMES LINES, EXTENSIONS, REINSPECTION FEES AND THE CITATION PROCESS. HAD MANAGER SIGN AND GAVE A COPY, GAVE THIRTY DAYS, ALSO LEFT ELECTRIC SHUT OFF TILL THE LICENSED ELECTRICAL CONTRACTOR ISOLATED PROBLEM AND THEN TURNED BACK ON, ALSO EXPLAINED THE EXCESSIVE GREASE BUILD UP ON APPLIANCES AND THE APPLIANCES ALSO HAD THE KNOBS MISSING AND BROKEN VALVES, ALSO GAS COMPANY SHUT VALES OFF TO THE APPLIANCES THA WERE LEAKING ON PRESSURE TEST, ALSO EXPLAINED THIS TO THE MANAGERS, UPON FURTHER INSPECTION FOUND A WATER HEATER THAT WAS INSTALLED AND THAT WAS POSING A SAFETY HAZARD DUE TO THE INSTALLATION OF WATER HEATER, UPON RESEACH FOUND THAT THE WATER HEATER WAS INSTALLED WITH OUT PERMITS, PERMITS WERE ALSO PLACED ON NOTICE OF VIOLATION FOR THE WATER HEATER, CONDEMNED BUSINES UNTIL ALL WAS BROUGHT UP TO CODE, TOOK PICTURES, HAD MANAGER SIGN AND GAVE COPY OF BOTH NOV AND CONDEMNATION, GAVE THIRT DAYS TO ABATE |