Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T12DV05881
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/15/2012 | INSP - INITIAL CODE ENFORCMENT | Approved | Visited site, met managers on site, inspected, found entire building had approximately four inches in height water retention, condemned unit due to standing water, found bare electrical wiring, did not allow any one in unit, called Tucson Electric and had power shut down in unit, also contacted Unisource and shut gas down,Tucson water was also on site and found that had to isolate sprinkler system to get water turned back on for the other units, had licensed plumber isolate sprinkler and water was back on to other units, i then inspected and found approximaetly forty feet of roofing collasped, took pictures, also all power, gas and water shut down on unit, Tucson water employee stated that the back flow proventor was not functioning and also needed to be replaced.Wrote Notice and had manager sign and gave a copy and gave ninety days |