Case: T12DV05777

Parcel: 127035520

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T12DV05777

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
07/10/2012 INSP - INITIAL CODE ENFORCMENT Approved 7/10/12 1:44PM, ON SITE INSPECTION WITH TENANT. WATER LEAK ON CEILING IN THE BATHROOM, WATER COMING FROM THE APARTMENT ON 2ND LEVEL. WATER CAUSING THE PAINT TO PEEL AND BUBBLE. SEAL ON REF. NOT SEALING WELL THEREFORE CAUSING THE REF. TO COOL TO ABOUT 48 TO 50 DEGREE. NOTICE OF VIOLATION WITH 30 DAYS TO ABATE VIOLATIONS.