Case: T12DV02766

Parcel: 138071030

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
08/13/2013 INSP - FOLLOW UP CODE ENFORCE Approved The permit has been finaled. At this time the case will be closed. Violation Abated, Close Case. RV.
07/29/2013 INSP - FOLLOW UP CODE ENFORCE Approved All the work is completed. Lacking is the drywall for the storage room for the fire wall has to be approved for design by Planning and Development Services Department. They have the approval and will start the work and hope to be completed in the next month. Will check in 30 days. RV.
11/16/2012 INSP - FOLLOW UP CODE ENFORCE Approved Office Follow Up:
Permit is still current and expries on 4-8-13 and lacking the finals and marking of the property pins. Will check in 60 days.
08/27/2012 INSP - FOLLOW UP CODE ENFORCE Approved The permit has been issued, T12CM03201 on 7-17-12 and the last inspection done on 8-21-12. The concrete has been poured on the front porch. Will check in 45 days. RV.
07/05/2012 INSP - FOLLOW UP CODE ENFORCE Approved I have been in contact with the owner and she is still going through the process. She need the neighbor to sign off and the house is vacant at the time and the house has been sold and not able to make contact with the new owner. She had approval from the previous onwer but he moved and now have to deal with the new owner for approval. She has included the new front porch in the plans and waiting for the D.D.O. to be approved. Only lacking the zoning and N.P.P.O. for approval. Will check in 45 days. RV.
06/01/2012 INSP - FOLLOW UP CODE ENFORCE Approved TALK TO THE OWNER AND THEY ARE GOINGTO BUILD A PORCH TO THE FRONT OF THE HOUSE. THEY WERE TOLD BY ZONING THAT IT WOULD BE EASIER FOR THE ROOM ADDED TO BE APPROVED IF ATTACHED TO THE HOUSE AND THEY WILL BE DOING THAT WITH BUILDING THE PORCH. SHE HAS DRAWINGS DONE AND WILL BE CHECKING IS THEY CAN BE APPROVED NEXT WEEK. ONCE THE PORCH IS APPROVED, ZONING WILL APPROVED THE ROOM ADDED. WILL CHECK IN 30 DAYS. RV.