Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date |
Description |
Inspector |
Results |
Comments |
| 02/21/2012 |
INSP - INITIAL CODE ENFORCMENT |
|
Approved |
MET WITH THE HOSPITAL REP. AND THE CONTRACTOR DOING THE WORK AND LOOKED AT ALL THE LOCATION THAT HAS WORK BEING DONE. THEY WERE TOLD THAT THE PERMIT WAS NOT REQUIRED AND WAS ONLY DOING SMALL REPAIRS. THEY ALSO THOUGHT THAT THE HOSPITAL REP. THAT WAS ON SITE WAS ALSO GIVING THEM CLEARANCE FOR THE WORK DONE. FOUND WHERE WALLS HAVE BEEN MOVED OR ADDED AND CHANGING OF ELECTRICAL AND PLUMBING WITH SPRINKLERS FROM FIRE ADDED OR MOVED. SOME OF THE HEAD WERE NOT MOVE AND WALLS HAD BEEN ADDED AND CHANGING THE FLOW OF THE WATER TO SPRAY FOR FIRE. DID CALL T.F.D. INSPECTORS AND THEY NEED PERMITS OR TO CHECK WHAT THEY HAD DONE WITH THE SPRINKLER HEAD ON MOVING OR ADDING OF WALLS. TALK TO LEERAY AND A PERMIT NEEDS TO BE ISSUED FOR THE WORK DONE AND THIS CONTRACTOR HAS BEEN AT ANOTHER LOCATION AND DID THE SAME KIND OF WORK AND THE PERMIT WAS ISSUED AND STILL BEING CHECKED ON PARK AVE. THEY WILL HAVE THE PLANS REDLINED AND TAKE TO LEERAY AND HAVE THE PERMIT ISSUED. WILL CHECK IN 45 DAYS. RV. |