Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T12DV00832

Parcel: 138211790


Addresses:

6869 S 6TH AV

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
08/20/2014 INSP - FOLLOW UP CODE ENFORCE Approved Talk to the owner and is still out of the states. He will call an inspection to have the permit extended. The owner is having trouble getting someone to do the work due to he is out of the states. Will check in 30 days. RV.
04/21/2014 INSP - FOLLOW UP CODE ENFORCE Approved The permit is still current and expires on 9-16-14 with the last inspection on 3-20-14 and needs correction. Will check in 90 days. RV.
01/13/2014 INSP - FOLLOW UP CODE ENFORCE Approved The permit is still current and expires on 5-12-14 with the last inspection on 11-13-13 with needing corrections. Will check in 90 days. RV.
10/09/2013 INSP - FOLLOW UP CODE ENFORCE Approved The last inspection was done on 9-24-13 and needs corrections. Will check in 60 days. RV.
09/24/2013 INSP - FOLLOW UP CODE ENFORCE Approved Office Follow Up:
The permit is still current and the last inspection was done on 9-19-13 and not able to enter the property due to the gates were locked. Have talk to the owner and he has called and has an inspection today and was waiting for the inspector. Will check in 10 days.
07/23/2013 INSP - FOLLOW UP CODE ENFORCE Approved Permit current. Expires 09/27/2013. Follow-up within 60 days.
04/23/2013 INSP - FOLLOW UP CODE ENFORCE Approved Permit expires 9/27/2013. Follow-up with 90 days.
03/20/2013 INSP - FOLLOW UP CODE ENFORCE Approved The work is still up and no inspection have been done. Did talk to the owner and he is working out of state and won't be back for a few weeks. Did let him know that the permit expires on 3-30-13 and gave the phone number to P.D.S.D. to call to try and get an extension. Went over that the footing needs to be inspected before the concrete is poured and that will give him another 180 days from that inspection if done before 3-30-13. Went over that the fines will start if nothing is done for the inspection or extension. Will check in 30 days. RV.
12/05/2012 INSP - FOLLOW UP CODE ENFORCE Approved Office Follow Up: Checked, permit has been issued, T12CM03002 on 10-1-12 and no inspection have been done. Did talk to the owner and will be doing the inspection in a couples of months. Will check in 60 days. RV.
08/22/2012 INSP - FOLLOW UP CODE ENFORCE Approved Office Follow Up:
Talk to the owner and the plans have been approved and lacking payment for the permit to be issued. The owners have lost their jobs and will be starting new jobs this week and are hoping to get the money they need in a couple weeks. The permit T12CM03002 has been approved on 7-27-12 and needs to be paid to have the permit issued. Will Check in 30 days.
06/25/2012 INSP - FOLLOW UP CODE ENFORCE Approved TALK TO THE OWNER AND THE DRAWINGS ARE BEING CORRECTED AND WILL BE SUBMITTING SOON. THEY WERE LACKING THE SITE PLAN AND THOSE HAVE BEEN DONE. WILL CHECK IN 45 DAYS. RV.
04/23/2012 INSP - FOLLOW UP CODE ENFORCE Approved TALK TO THE OWNER AND SHE IS GETTING THE DRAWINGS DONE BUT ARE LACKING A FEW ITEMS THAT ARE NEEDED ON THE DRAWINGS. SHE IS HOPING TO HAVE THOSE CORRECTION DONE THIS WEEK AND WILL BE SUBMITTING BY NEXT WEEK. WILL CHECK IN 45 DAYS. RV.
04/17/2012 INSP - FOLLOW UP CODE ENFORCE Approved MET WITH THE TENANT AND SHE GAVE ME PHONE NUMBER TO CALL THE OWNER. SHE GIVES THE OWNER THE MAIL THAT IS SENT TO THIS ADDRESS. WILL TRY AND CALL THE OWNER. WILL KEEP THE SAME FOLLOW UP DATE ON 4-23-12. RV.