Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/07/2012 | INSP - INITIAL CODE ENFORCMENT | Approved | EMERGENCY CALL OUT BY TFD, FIRE DAMAGE TO THE BUILDING'S TRANSFORMER THE UNIT BELONGS TO TEP. IN CLOSE PROXIMITY OF THIS UNIT ARE THREE / 3 INCHES METAL CONDUIT PIPES WHICH RUN ALONG THE BUILDING STEEL SHEATHING WALL INTO THE EARTH (POSSIBLE HEAT DAMAGE) THE OTHER SIDE OF THE WALL WHICH ABUTS THE TRANSFORMER ARE PANEL BOARDS AND SWITCH GEARS. I AM UNABLE TO DETERMINE IF THERE IS ANY KIND OF DAMAGE IN THIS AREA. THE TRANSFORMER WAS THE BUILDINGS SOLE SOURCE OF POWER. THE BUILDING EXTERIOR SHEATHING IS METAL. THERE ARE SIGNS OF WARP AGE AND HEAT DAMAGE IN THIS AREA. THE INTERIOR INSULATION IS IN QUESTION. THE MANAGER STATED TO ME, TEP AND TFD THAT THEY HAVE SOME CHEMICAL THAT MUST BE COOL TO 55F DEGREES. THE LOCATION OF THE AREA IS IN THE WESTSIDE OF THE BUILDING. THEY HAVE ORDERED A GENERATOR FROM EMPIRE. THERE PLAN IS TO CONNECT TO THE ROOM AND KEEP THE CHEMICAL COOL. I CALLED SUPERVISOR TO BRIEF, WILL CHECK WITH DSD ON MONDAY FOR PERMIT REQUIREMENTS. SCHEDULE A 30 DAY FOLLOW UP INSPECTION |