Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2013 |
PLUMBING - ROUGH, SOIL |
|
Approved |
NOT INSTALLED EXACTLY LIKE THE PLAN, GUT MEETS IRC REQUIREMENTS WITH A COUPLE OF EXTRA CLEAN OUTS. OK TO COVER. |
| 01/15/2013 |
PLUMBING - ROUGH, SOIL |
|
Not ready for Inspection |
1. Where a vent connects to a horizontal drain, it shall have its invert taken off above the drainage center line, downstream of the trap being served. Note: A blake tee is not a drainage fitting. It is listed as a vertical surface wall clean-out. (NO correction required at this time. 3" building drain requirs a full size clean-out. |