Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T12CM07840
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2013 | BUILDING - FINAL | Approved | ||
| 09/06/2013 | BUILDING - FINAL | Not ready for Inspection | 1. Each water supplied device to have its own backflow protection. One device for the carbonator. One device for the water fountain. One device for the ice machine, if applicable. No splitting downstream of the device. PVC drains require purple prtimer. 1" air gap will be strictly enforced. | |
| 09/04/2013 | BUILDING - FINAL | Not ready for Inspection | ||
| 08/08/2013 | BUILDING - FINAL | Not ready for Inspection | 1. | |
| 08/08/2013 | BUILDING - FINAL | Not ready for Inspection | 1. Girls Restroom #313 complete. East restroom #113 complete. Panther Hall Restroom complete. Soffitts P.E. Bldg. Electric above ceiling Stucco mesh at Wesst end of 500-508. Electric in walls at Concession. MG 114, and 115 complete. A-109 A-110 complete. | |
| 08/01/2013 | BUILDING - FINAL | Not ready for Inspection | 1. Restrooms #114, #220, #219, #312, #414, #415, #413, #309, STC 101, STC 102, G 100, G 102, G 134, G 146, MG 116, MG 117, these rooms complete. | |
| 07/18/2013 | BUILDING - FINAL | Not ready for Inspection |